Next step - scalable prototype
The approach of an high-altitude wind power station with a diffusor and forwarding the energy as compressed air generates
new possibilities for regenerative energy production.
The technical main concept is approved.
From the economical point of view, the production costs are the lowest costs for producing electrical power,
for fossil as well as for renewable energy production.
Related to the actual status of the other renewable energy production, the different technologies are producing
with higher costs than the fossil power.
In the next step it is planned to build a scalable prototype, this prototype has the goal to get a closer design
of the high-altitude wind power station.
The scalable prototype is not a material prototype it is a prototype a get a closer design of the high-altitude wind power station.
The goal is to validate the new technologies for the high-altitude wind power station.
At the same time, it is important to find a country, where the first prototype as well as the first wind park can be placed.